-----
Skip to content1941 (late) split core w/ wire channel
This radiator is intended as a drop in replacement and set-up for the OE engine in its production year. The first images are restorations and the others are our fabricated drop in replacement. The late 1941 tank is taller, the top hose connections lower and core divider is a different construction than the 39-early '41. Split core and donut crank pass through radiator includes the electric wire channel.
If you have modified or altered your vehicle in anyway, please order from the bespoke radiator section. If you wish to restore your OE radiator using your OE tanks, brackets and/or castings please visit the restoration section of our website to begin the process.
Made in the USA
In this period Ford manufactured radiators at Dearborn (D), and also at Green Island G) and had three additional suppliers, Modine (MO), McCord (MC), and Long (L). Ford furnished those outside suppliers with top and bottom tanks (11A) to be fitted with cores. 1940 and early (~January 1941) had the top fill on the angled portion of the tank. Later in 1941 the tank geometry changed and the filler cap was located in the top center. Please order accordingly.
We make to order. Please allow adequate time for us to build.
Build time estimates [August 2024]
Brass Model Ts 6-8 weeks
Black Model Ts FT 5-6 weeks - RT is 8 weeks
Model As 6-8 weeks
Heater cores 6-8 weeks
Model A and 32 Ford Street rods 8 weeks
Common street rods 15 weeks
Tricky customs & restorations 4-4.5 months
We appreciate your patience as we continue to recruit and train new fabricators.
Merry Christmas. We will be closed for the holidays and inventory from Dec 20th until Jan 2nd.
We make to order. Please allow us time to build.
Build time estimates [Jan 2025]
Brass Model Ts 12 weeks (foundry consolidation issue)
Black Model Ts FT 12 weeks - RT is 14 weeks (foundry consolidation issue)
Model As 4-6 weeks
Heater cores 6-8 weeks
Model A and 32 Ford Street rods 8 weeks
Common street rods 15 weeks
Tricky customs & restorations 4-4.5 months
We appreciate your patience as we continue to recruit and train new fabricators.
explore the site